就爱字典>英语词典>reclamation翻译和用法

reclamation

英 [ˌrekləˈmeɪʃn]

美 [ˌrekləˈmeɪʃn]

n.  (荒地等的)开垦,改造

复数:reclamations 

TOEFL经济

BNC.15675 / COCA.19656

柯林斯词典

  • N-UNCOUNT (荒地等的)开垦,改造
    Reclamationis the process of changing land that is unsuitable for farming or building into land that can be used.
    1. ...centuries of sea-wall construction and the reclamation of dry land from the marshes...
      几个世纪以来建造海堤并将沼泽地改造成为良田的行动
    2. The area is needed for a land reclamation project.
      一个土地开垦项目要在这一地区进行。

英英释义

noun

  • the recovery of useful substances from waste products
    1. rescuing from error and returning to a rightful course
      1. the reclamation of delinquent children
      Synonym:reformation
    2. the conversion of wasteland into land suitable for use of habitation or cultivation
        Synonym:renewalrehabilitation

      双语例句

      • Some suggestions for dump reclamation planting were given in this article.
        据此提出了矿山排土场复垦种植的相应建议。
      • The malting barley production of coastal reclamation area in Jiangsu have an important position in whole province and Yancheng.
        江苏省沿海垦区在全省及盐城的啤酒大麦生产中有着重要的地位。
      • First introducing some land reclamation methods in common use in coal mining caused subsided land, this article introduces the characters of lake mud stowing technology.
        分析了采煤塌陷地几种常用复垦技术,介绍了湖泥充填技术的特点,阐述了湖泥充填复垦技术的可行性、环保性和经济性。
      • Sewage Treatment and Water Reuse and Reclamation Analysis and Research of Qingdao
        青岛市污水处理和中水利用分析与研究
      • These included the Green Island reclamation, Tonggu waterway, and Siu Lam typhoon shelter.
        这些工程包括青洲填海、铜鼓水道及小榄避风塘。
      • We will be speeding up reclamation and land formation over the next 10 years;
        在未来十年,我们会加速移山填海,开发土地;
      • That connects to a sewer that takes the sewage to one of the Bloomington-Normal Water Reclamation District treatment plants.
        控制阀和一个污水管连接,把污水排入地区日常水处理工厂。
      • Unlike Hong Kong, Macao does not have territorial waters and reclamation projects require special approval from Beijing.
        与香港不同,澳门没有领海,其填海造地项目必须得到北京的特别批准。
      • The Contractor shall prepare a plan and design for the reclamation area and the spoil grounds.
        承包商应就填海区和废弃场制定计划和设计。
      • According to the current study of used sand reclamation and its development, new viewpoints of selecting the methods and equipments of used sand reclamation are expounded.
        根据旧砂再生研究和发展的现状,阐述了选择旧砂再生工艺方法及设备的新观点。