就爱字典>英语词典>fixturing翻译和用法

fixturing

英

美

(fixture 的现在分词) n. 固定(状态), 固定物, 设备
[计] 夹具
fixture的现在分词

计算机

双语例句

  • These include magnetic workholding, fixturing, and material handling equipment for the metalworking industries.
    产品在金属加工领域应用在磁性装卡、具和物料搬运方面。
  • Without proper shielding of the switches, interconnecting cables, and test fixturing, spurious signals ( offsets) may be generated that will compromise the signal being measured.
    若开关、互连电缆和测试夹具没有合适的屏蔽,所产生的杂散信号(偏移)将威胁到被测信号。
  • The framework structure of automation fixturing design system is discussed in this paper. The workpiece deformation analysis module is established in preliminary fixturing design configuration. The workpiece deformation is confirmed based on the use of finite element analysis tool and quantitative approach.
    描述了一种自动装夹设计系统体系结构,并建立了初始装夹设计方案中工件最大变形的分析模型,应用有限元分析工具对工件最大变形进行定量分析;
  • The feature-based workpiece integration model is developed. Fixturing feature model, feature information pick-up process, feature identifying and feature mapping method are analyzed.
    分析了基于特征的工件集成模型,重点研究了装夹特征模型、装夹特征提取流程、约束特征识别方法和特征映射方法。
  • This paper has put forward the method to build mould of location reference plane in CADF, and on this foundation has analyzed the influence of positioning error for workpiece geometry precision. It has offered theory foundation for correcting and improving fixturing design.
    提出了在计算机辅助夹具设计(CAFD)中定位参考面的建模方法,并在此基础上分析了定位件位置误差对工件几何精度的影响,为校验和改进夹具设计提供了理论基础。
  • One of the significant impediments to the application and evolution of truly flexible manufacturing systems is the absence of truly flexible fixturing systems.
    夹具的非柔性(或专用性)严重地阻碍了柔性制造系统的应用及发展。
  • To minimize errors due to such leakage paths, choose a switch card with high isolation resistance and use guarding wherever possible, including in the test fixturing and cabling.
    为了最小化这样的漏泄通路引起的误差,请选择具有高隔离电阻的开关卡,并尽量采用保护线,包括测试夹具和电缆。
  • Study and Practice of Fixturing on Based Phase change
    基于状态变化的工件定位与夹紧方法的研究与实践
  • The fixturing techniques advanced with the development of the industry.
    夹具的发展与制造系统的发展是同步进行的。
  • The settling time of the measurement is affected by the shunt capacitance, which is due to the connecting cable, test fixturing, and the DUT.
    测量的建立时间受并联电容的影响,而并联电容则是由连接电缆、测试夹具和DUT产生的。